Home  |  About us  |  Products   |  Support  |  Contact us
   
Home >> About us >> QC
Great Power is implementing ISO9001:2000 system, it`s quality assurance system makes of IQC, IPQC, FQC, QE, QA and Metrology. A complete number of standards ranging from raw material inspection, manufacture process, control to shipment inspection (QA); more than 280 quality control employees; the advanced inspection equipments and detailed quality management files, that make it possible to keep every processing step on the battery production lines in strict control.
IQC
Inspect and control over all incoming materials and components to make sure that only qualified supplies flow into each production run.
IPQC Inspect and control over all of manufacturing processes. Being quality warning, every staff is called on to join in efforts to maintain ongoing consistency and quality, and when anything goes wrong, correction is done quickly.
QA In charge of all tests in QA division according to IEC standards and customers` requirements. Every single cell is tested and sorted on chemical-electric testing panel before moving on to assembly lines.
QE Quality Engineer work with product quality control system, manufacturing process technical issues and product implementation. Broad training enables them to analyze the process capability of manufacturing operations, suggest processing and product construction changes, and solve both short-and long-term problem.
FQC Final inspection on finished goods before shipment is to assure delivery without any defect.
 
[ E-mail ]
Copyright(C)2005 GREAT POWER BATTERY (HK) CO.,LTD. All rights reserved.